{"title":"Safe Work Method Statements","description":"\u003cp\u003eSafe Work Method Statements (SWMS) prepared for high risk construction work as defined in the model Work Health and Safety (WHS) Regulations.\u003c\/p\u003e\u003cp\u003eEach Safe Work Method Statement identifies the high risk construction work being undertaken, the health and safety hazards arising from it, the control measures to be applied, and how those measures are implemented, monitored and reviewed.\u003c\/p\u003e\u003cp\u003eDrafted to ninety percent by a qualified Health, Safety, Environment and Quality (HSEQ) consultant. You complete the site-specific detail, consult your workers, and sign off.\u003c\/p\u003e","products":[],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0771\/4298\/2819\/collections\/collection-safe-work-method-statements.png?v=1785620095","url":"https:\/\/www.risky.net.au\/collections\/safe-work-method-statements.oembed","provider":"Risky Digital","version":"1.0","type":"link"}